Jump to content

VA Drops Millions on Delayed Solar Power Projects


Geee

Recommended Posts

va-drops-millions-delayed-solar-power-projectsFree Beacon:

The Department of Veterans Affairs has spent more than $408 million to install solar panels on its medical facilities in recent years, despite many of the projects experiencing significant delays and some of the systems not becoming operational at all.

 

The VA has failed to effectively plan and manage these solar panel projects, resulting in significant delays and additional costs, according to a report released by the agency’s inspector general last week.

 

The watchdog conducted an audit of 11 of the 15 solar projects awarded between fiscal years 2010 and 2013 that were still in progress as of May last year. The investigation, which was completed in March, found that only two of the 11 solar panel projects were fully completed.

 

“This occurred because of planning errors, design changes, a lengthy interconnection process, and contractor delays,” the inspector general concluded. “As a result, VA did not increase renewable energy for those solar projects in the time frame planned and incurred additional costs through needed contract modifications.”Scissors-32x32.png


Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • 1716117070
×
×
  • Create New...